In order to improve the emergency response abilities of marine emergencies, take the rapid and effective
emergency measures to quickly control crude oil leakage and pollution diffusion; to avoid and reduce
casualties to the greatest extent, and to minimize economic losses. At the same time, it will test the
operability of the contents of the marine oil spill emergency response plan and the emergency
response capabilities of various departments after marine emergencies, Zhejiang Petrochemical
Co., Ltd. organized and carried out maritime oil spill emergency drill.
On June 22, the participating units and ships on the Yushan side were ready to enter the drill
preparation stage. With the command of the drill commander He Jianbo, the drill was officially
begun: the drill set a submarine pipeline 1 km away from the landing end of Yushan. A nearby
ship lifted anchors privately, causing the crude oil pipeline to leak. Radar monitoring personnel
quickly turned the camera to check. In the video, a large area of oil pollution was found in the
Yushan Island landing section. Subsequently, the company responded to the oil spill emergency
response and carried out marine oil spill emergency repair operations and drilled the participating
ships. There were 11 ships and 150 participants. participated in this drill.The drill is divided into
8 stages, including emergency response reporting procedures, technical professional emergency
handling, material dispatch, emergency ship assembly, oil booms deployment, oil spill recovery,
and diver water explore the pipes, pipe fixture installation and other subjects. During the drill,
all professions and departments cooperated quickly, cooperated in an orderly manner, and
handled properly, and successfully completed the exercise task.