According to the drill plan, the relevant “construction ship” encountered oil spill when the ship
hit the reef in the downstream waters of Jinghong New Bridge. The channel maintenance
company promptly dispatched oil spill handling personnel to carry oil pollution-related materials
and rushed to the rescue ship as soon as possible After the turning waters of No. 4 dam of
Jinghong Dashaba, the company deployed in accordance with the company's ship oil spill
disposal plan. Two ships were used to deploy oil booms to prevent the oil from spreading
further, and to limit the oil spill to a minimum range. The oil absorbent pads will absorb
oil stains, and the recovered oil absorbent pads and oil stains will transport to the port for
disposal by a qualified unit after the oil stains are removed. After more than two hours of
intense and orderly disposal, the oil spill disposal drill was successfully completed.