The Wenzhou Port and Shipping Management Center organized the acceptance meeting of the
trial trench for the deepwater access channel project in the central port area of Wenzhou Port
in Wenzhou. The meeting listened to the summary reports of the participating units on the
quality, progress, safety and other aspects of the trial trench, consulted relevant internal
industry materials, and believed that the engineering design and construction complied
with the requirements of relevant national and industry regulations and mandatory
provisions. The tripartite inspection and design review refers to the acceptance criteria
of the waterway infrastructure dredging project(by using dredging ships and silt curtains)
in the "Quality Inspection Standards for Water Transport Engineering" (JTS257-2008), the construction quality meets the relevant requirements, and the trial trench is
agreed to be handed over for acceptance.