In the river section of Pudong Village, dredging workers are constantly washing the silt. The dredging work
here is carried out in full swing. Suction pumps, silt curtains and dredging workers can be seen everywhere,
and the entire construction site is in order.
"After a long period of rain washing, mud and sand have continuously washed into the river course, causing
excessive siltation of the river bed, affecting the cleanliness and tidiness of the river course, weakening the
water storage capacity of the river course, and also causing pollution to the water body. It is now in the dry
season. Our dredging project completely removed the silt accumulated in the river course to ensure that the
clean and unblocked of rivers, it is conducive to improving the rural water quality, strengthening the water
storage capacity of the river course, and giving full play to the irrigation and drainage functions of the rural
river course, which is good for spring irrigation preparation, and at the same time it will lay a good foundation
for flood control and drainage in the next flood season." said the dredging worker.