86-13819027011

Miansi Town Minjiang River dredging work is in full swing

In order to ensure that the life and property safety threats of the people on both sides of the strait, before 

the flood season, the section from the cable bridge to Feishaguan in Qiangfeng Village, Miansi Town, is 

working hard to carry out river dredging.


From the cable bridge from Feishaguan of Qiangfeng Village in Mianlai Town, a large number of congested 

bodies entered the Minjiang River due to the "8.20" large debris flow disaster, raising the river bed, and 

threatening the lives and property of people on both sides of the strait as the flood season approaches. 

The dredging mileage of this section of the river is 4.145 kilometers, involving more than 1.4 million 

square meters.It will used silt curtains and dredgers. After the completion of the dredging work, the 

threat to the lives and property of the people on both sides of the strait will be effectively reduced.

 

Get Started Now with Contact



Whats App Us