86-13819027011

Ningbo Zhoushan Port carried out “119”ship-shore joint comprehensive emergency drill

In 2020, Ningbo Zhoushan Port “119”ship-shore joint comprehensive emergency drill 
was held at the Daxie 300,000-ton crude oil terminal.

The drill was simulated that during the loading process of the “Zheyongyou 10” tanker 

at the No. 2 berth of the China National Petroleum Terminal, a small amount of crude 

oil entered the sea due to the ship’s operating errors. After the danger was occurred, 

CNPC immediately launched the "Offshore Oil Spill Site Disposal Plan", implemented 

various emergency response measures, and sprayed oil spill dispersants to carry 

out offshore oil spill cleanup operations. During the period, the ship’s deck caused 

a fire due to static electricity generated by the cleaning operations, and the CNPC

immediately launched the "Fire Site Disposal Plan" to assist in the evacuation 

of the relevant ship personnel, and at the same time, they reported the request 

of the maritime affairs, port bureau, port survey, shipping department and other 

units Fire forces assist. Subsequently, the ship "Yonggang Xiaotuo No. 7" ship 

and "Yonggang Xiaotuo No. 8" ship rushed to the scene and released water to 

extinguish the open fire.

 

Get Started Now with Contact



Whats App Us