The main channel of the east and west ports in Shijiu port area of Rizhao port
is carrying out maintenance dredging project. The construction time is from
August 27, 2020 to November 26, 2020. The operation content is dredging
and dumping.It will used the dredger and silt curtains for controlloing the
silt and dumping the sludge.