86-13819027011

Diantou Town Yishan Village: Dredging rivers to improve flood prevention capacity

Recently, Diantou Town Yishan Village organized villagers to carry out dredging work on Houkengxi 

in the area under their jurisdiction. It is understood that there are 4 kilometers of river channels 

and ditches in the area between Houkengxi and Sundian Natural Village, which have slumped 

foundations and blocked weeds, and it has seriously affected the drainage of the water system 

and remained for drought resistance hidden danger. At the same time, it greatly affected the 

production and life of villagers in the surrounding and downstream villages.

During the dredging work, the river was cleared for 3 kilometers, more than 1,500 cubic meters 

were dredged, and the river dam was strengthened for more than 800 meters. It was used 

a amount of silt curtains and dredgers.After remediation, the aspect ratio is increased, the river 

channel is significantly widened and deepened, the water surface is free of debris, the water 

system is smoother, the river's sand discharge capacity is stronger, the sedimentation rate of 

the river channel is reduced, and flood control safety is ensured.

 

Get Started Now with Contact



Whats App Us