Recently, Diantou Town Yishan Village organized villagers to carry out dredging work on Houkengxi
in the area under their jurisdiction. It is understood that there are 4 kilometers of river channels
and ditches in the area between Houkengxi and Sundian Natural Village, which have slumped
foundations and blocked weeds, and it has seriously affected the drainage of the water system
and remained for drought resistance hidden danger. At the same time, it greatly affected the
production and life of villagers in the surrounding and downstream villages.
During the dredging work, the river was cleared for 3 kilometers, more than 1,500 cubic meters
were dredged, and the river dam was strengthened for more than 800 meters. It was used
a amount of silt curtains and dredgers.After remediation, the aspect ratio is increased, the river
channel is significantly widened and deepened, the water surface is free of debris, the water
system is smoother, the river's sand discharge capacity is stronger, the sedimentation rate of
the river channel is reduced, and flood control safety is ensured.