In the Mihe River flood control project, all the rivers of the Mihe River except the Qingzhou Mihe River
Wetland Park were dredged. The dredging length was 143.649 kilometers, and the river's ability to
prevent floods and disasters was upgraded.It was used silt curtains and dredgers.