In order to improve the water emergency assistance abilities in the Dongzhi section of the Yangtze River
and the overall level of water pollution prevention and emergency assistance abilities. On the morning
of September 26, the V-standard project manager of the Wu'an section of the Yangtze River Nanjing
Waterway Engineering Bureau invited the environmental protection experts and environmental monitoring
personnel of the Environmental Monitoring Center of the Yangtze River Navigation Administration to
organize 2019 water emergency drill, it was dispatched 6 ships, more than 30 crew members and a drone.
The exercise was a no-prevention drill. The drill was carried out four subjects: heavy-duty ship stranding,
oil spill caused by ship stranding, rescue of stranded ship personnel during the ship-shelving process, and
ship fire during rescue.
The drill was simulated when the lower cargo ship was sailing to the east channel, it was suddenly stranded,
and the oil spill was occurred and the personnel fell into the water. After received the police, the sea
patrol boat responded quickly, coordinated the crane to transfer the cargo, organized the ship to rescue
the drowning personnel, and laid the oil booms. Subsequently, the front of the floating crane caught fire
and the sea patrol organization organized fire fighting operations. After the final reversal, the fire was
successfully extinguished and the drill was ended.
During the drill, the participating units cooperated with each other and carried out various rescue operations
in close combat; the V-standard project department of Wu'an section first participated in the drill,and used the
drone, it was added scientific and technological strength to improve the power generation of the water rescue.