On May 14th, the Yumen River dredging work in the provincial capital was carried out in
an orderly manner to ensure the smooth flow of rivers, eliminate black and odorous water
bodies, and improve flood control standards. It was firstly used silt curtains and excavator
to control and clean the silt. The beauty of the water and clear green will become a reality
step by step.