Shaoguan Nanxiong City has a heavy rain, partial places are heavy rain, Due to the heavy rain,
the floating biomass in the upper reaches of the Minjiang River caused the urban floating objects
to accumulate excessively, and the scaffolding of the Xiongzhou Corridor in Nanxiong City was
not demolished. The river floats block the river channel, causing the river water in the Qingyun
Road, Weixin Road and Xinfeng Road sections of the urban area to be poured through the
sewers, and some roads have accumulated water.
In response to the rainwater flooding caused by heavy rain and urban flooding, the Nanxiong
Municipal Party Committee and the Municipal Government quickly took emergency measures
and set up a temporary flood control emergency rescue headquarters. Wang Bian, the
secretary of the municipal party committee, and Lin Xiaolong, the mayor, went to the scene
at the first time to eliminate the command. That night, the headquarters organized large-scale
mechanical equipment to clear the floating debris of the river, and went all out to ensure the
smooth flow of the river. It was used silt curtains for controlling and cleaning the floating materials.
As of the morning of the 6th, the floating material of the river channel in Nanxiong City has been
basically cleared, and the water section has obvious water retreat.