86-13819027011

Nanxiong river channel is blocked and it is dredged overnight

Shaoguan Nanxiong City has a heavy rain, partial places are heavy rain, Due to the heavy rain, 

the floating biomass in the upper reaches of the Minjiang River caused the urban floating objects 

to accumulate excessively, and the scaffolding of the Xiongzhou Corridor in Nanxiong City was 

not demolished. The river floats block the river channel, causing the river water in the Qingyun 

Road, Weixin Road and Xinfeng Road sections of the urban area to be poured through the 

sewers, and some roads have accumulated water.


In response to the rainwater flooding caused by heavy rain and urban flooding, the Nanxiong 

Municipal Party Committee and the Municipal Government quickly took emergency measures 

and set up a temporary flood control emergency rescue headquarters. Wang Bian, the 

secretary of the municipal party committee, and Lin Xiaolong, the mayor, went to the scene 

at the first time to eliminate the command. That night, the headquarters organized large-scale 

mechanical equipment to clear the floating debris of the river, and went all out to ensure the 

smooth flow of the river. It was used silt curtains for controlling and cleaning the floating materials.


As of the morning of the 6th, the floating material of the river channel in Nanxiong City has been 

basically cleared, and the water section has obvious water retreat.

 

Get Started Now with Contact



Whats App Us