86-13819027011

Yangkou Port Area 150,000-ton waterway dredging passed the acceptance inspection

On January 24th, the Yangkou Port 150,000-ton waterway project (first phase) of Nantong 

Port passed the quality appraisal and delivery acceptance, which realized the one-way navigation 

of the world's largest LNG ship, and created the new record of deep water waterway of the

Nantong coastal port through dredging.


The project is designed the full-water one-way navigation of 267,000 cubic meters of LNG ships. 

The designed navigation width is 348 meters. The designed navigation depth is 14.07 meters. 

The designed siltation depth is 0.4m meters and the total length of the channel is 22 kilometers. 

The design base height of the first stage of the project is -14.5 meters, the bottom width of 

the dredging trench is 341.6 meters, and the length of the trench is about 18 kilometers.


The construction of the project will carry out the concept of eco-environmental protection

 throughout. In order to avoid the marine environment pollution by the construction, the unit 

that has entrusted the some enterprises which has the qualification of marine environmental 

protection and pollution removal for clearing the oil spill and domestic garbage in the construction 

sea area, It was used oil booms and silt curtains for clearing the oil spill and domestic garbage 

and carried out the construction of the green port.

 

Get Started Now with Contact



Whats App Us