In order to further improve the living environment of Renhe District,
ensure the clear water storage quality of the Renhe Riverside Park.
Recently, the Renhe District Urban Management Bureau organized
construction personnel to dredge the rivers of Binhe Park.
Binhe Park is a key landscape project in Renhe District, with a total
length of 5.1 kilometers. In order to ensure the beautiful and
pleasant water environment of the river, after the rainy season,
the Renhe District Urban Management Bureau will organize the
construction team to catch the box culvert of the rubber dam
face 1 to 8 the rainwater and sewage pipelines, the flood drainage
ditch, the Hexi Treading Pool and the sludge, garbage and weeds
deposited on the river are thoroughly cleaned. It was used
silt curtains for controlling the sludge, garbage and weeds, and then
cleaned it. After the completion of the dredging, Binhe Park will
reproduce the pleasant landscape of “Smooth River, Clear River,
green shore and beautiful scenery”, which providing an ideal place
for the general public for leisure, recreation and fitness.