On September 10, a construction vessel was dredged in the waters of the 250,000-ton
waterway project in the Jingtang Port area of Tangshan Port. The 250,000-ton waterway
project in the Jingtang Port Area of Tangshan Port in Hebei Province is intensifying
construction. According to reports, the 250,000-ton waterway project was started
construction in May this year, the total length is 31.7 kilometers, and the navigation
waterway width is 270 meters. After the completion of the project, the Jingtang
Port Area can realize the all-weather entry and exit of 200,000-ton bulk carriers.
250,000-ton bulk carrier can be in and out in the tide situation. It was deployed
a large number of silt curtains and used dredger.